Laserfiche WebLink
2. Chapter A - Introduction <br />a) The executive summary in this section should be rewritten to reflect <br />the partial approval of the original mine plan It would be helpful <br />in this section to sunmarize the history of the original review <br />process which led from a 4-mine, 4 mil. tpy operation to the final <br />approval of a 1-mine 10,000 tpy operation. This history would <br />provide a prospective and framework for remainder of the permit. <br />The first sentence on page A-5 should be revised to reflect the <br />proper number of volumes in the permit. In addition, it may be <br />possible to incorporate the executive summary into the <br />introduction. It is also suggested that the legal citations on page <br />A-b through page A-11 be deleted. Although these citations may have <br />been the basis for discussion in the original permitting, they are <br />now moot. <br />3. Chapter B -Legal, Financial and Related Information <br />a) Due to the name change from Northern to Enron and associated changes <br />in company officers, contact people, etc., this entire chapter must <br />be reviewed and revised as necessary. Information should be <br />consolidated where possible. Proof of the legal name change should <br />be provided in an appendix to the chapter. <br />b) The lists of surface and subsurface owners should be consolidated so <br />that it is not repeated several times. <br />c) The list of violations in section 2.3 should be updated to include <br />only violations which occurred less than 3 years ago. <br />d) All permit information in section 7.0 should be updated to include <br />current permit numbers and status. <br />4. Chapter C - Mine Operation Plan <br />a) The introduction on page C-1 refers to the previous approval of the <br />surface facilities and Rienau No. 2 Mine plan in permit 78-345. <br />This information must be included in this chapter, rather than being <br />referenced. Although the operations plan for Rienau appears to have <br />been inserted in July, 1984, information on the facilities, and the <br />Rienau reclamation plan is not included. <br />b) Information on the mining of other seams, on pages C-25 through <br />C-28, should be deleted. If information relevant to the approved <br />plan is contained within these pages, it should extracted and <br />retained in the permit (i. e. permit term information). <br />c) Section 3.6.2 on page C-49 should be modified to delete the two <br />proposed mines. <br />d) Pages 13-19 and 13-20 in the refuse area report are duplicates. <br />Page 13-20 should be removed. <br />2 <br />