My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL51116
DRMS
>
Back File Migration
>
General Documents
>
GENERAL51116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:32 PM
Creation date
11/23/2007 6:33:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
General Documents
Doc Date
6/11/2001
Doc Name
PN M-77-344 PORTLAND LIMESTONE QUARRY HOLNAM INC DISPOSAL OF INTERT MATERIAL FROM THE PORTLAND PLANT
From
HOLNAM
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOWAY INC. <br />Pdlls,tl Plx,l <br />3500 HipHraY 1I0 <br />P.O. Baz 319 <br /> <br />Phone'7147848325 <br />""""`°'C0B1~ RECEIVED <br />F~a: ]147813170 <br /> JUN 1 1 2001 <br />HOLNAM Division of Minerals and Geology <br />~I I I I~ ~ II I I~ I~~~ ~I~ <br />June 8, 2001 <br />Mr. Larry Oehler <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Permit Number M-77-344 Portland Limestone Quarry <br />Holnam, Inc. <br />Disposal of inert material from the Portland Plant Site <br />Deaz Mr. Oehler: <br />I am writing this letter to inform you that Holnam Inc. would like to backfill inert <br />structural fill generated from an azea that is not within the current permitted boundazies. <br />The inert structural fill material will be generated from a plant demolition project. I have <br />included a map that identifies the areas affected. Area I encloses the plants from which <br />the inert material will be removed and Area 2 encloses the location in the quarry that the <br />inert material will be disposed. <br />The demolition project will commence on June 18, 2001 and continue through the end of <br />September 2001. Material will be stockpiled until proper approval has been obtained. <br />The estimated volume of material is 5,000 tons The inert material that will be generated <br />from the demolition project includes concrete, gravel, rock, and rttasonry. <br />The demolition material will be hauled to the quarry by dump trucks. The material will <br />be properly stabilized and compacted. A 2:1 slope will be maintained on the dump and <br />covered with quarried overburden material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.