Laserfiche WebLink
<br />RIDER TO MINING PERMIT <br />Permit Date: May 26, 1988 <br />Permit No: C-81-008 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. 03 <br />PEABODY COAL COMPANY WILL INSTALL CONTINUOUS FLOW MONITORING DEVICES AT <br />THE UPSTREAM PERMIT BOUNDARY AND DOWNSTREAM PERMIT BOUNDARY OF THE <br />LOWER SECOND PARK IRRIGATION DITCH. THESE DEVICES SHALL BE INSTALLED <br />AS SOON AS POSSIBLE BUT NO LATER THAN AUGUST 1, 1988. WATER QUALITY <br />SAMPLING SHALL COMMENCE SIMULTANEOUS WITH THE INSTALLATION OF THE <br />CONTINUOUS FLOW MONITORING DEVICES AND SHALL BE SAMPLED AT THE SAME <br />FREQUENCY AND FOR THE SAME CONSTITUENTS AS THE OTHER SURFACE WATER <br />MONITORING SITES OF THE NUCLA MINE: RESULTS OF THIS MONITORING WILL BE <br />INCORPORATED INTO THE ANNUAL HYDROLOGY REPORT. THE DIVISION WILL <br />ENTERTAIN DISCONTINUATION OF THIS MONITORING AFTER A MINIMUM OF TWO <br />YEARS OF MONITORING IF THERE IS NOT A WIDE FLUCTUATION IN DATA RESULTS <br />FROM ONE YEAR TO THE NEXT. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />President, Western Division <br />By ti...,.' abody Coal Company <br />AG Alpha No: NR LR TYB <br />AG File No. PNR/3928/JD <br />