Laserfiche WebLink
RIDER TO MINING PERMIT <br />Stipulation No. 5 <br />THE PERMITTEE SHALL SUBMIT AN ANNUAL HYDROLOGY REPORT BY JANUARY 30 OF <br />EACH YEAR WHICH PRESENTS AND DISCUSSES THE MONITORING DATA COLLECTED <br />DURING THE PAST YEAR. <br />Stipulation No. 17 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION BY JANUARY 30 OF EACH YEAR AN <br />ANNUAL REPORT WHICH INCLUDES A SUMMARY OF THE PREVIOUS CALENDAR YEAR'S <br />PIT EXPANSION, THE CUMULATIVE TOTAL NUMBER OF ACRES STRIPPED, ACRES <br />RECLAIMED, AND DISTURBED ACRES REMAINING TO BE RECLAIMED. THE REPORT <br />WILL ALSO INCLUDE A MAP SHOWING ACTUAL RECLAIMED TOPOGRAPHY AND A <br />REPORT OF BACKFILLING MASS BALANCE CALCULATIONS. <br />Stipulation No. 20 <br />ASH MATERIAL AT THE KEENESBURG MINE MUST BE BURIED A MINIMUM OF EIGHT <br />(B) FEET BELOW THE FINAL POST-MINING RECLAIMED SURFACE. <br />Stipulation No. 21 <br />ASH MATERIAL AT THE KEENESBURG MINE MUST BE BURIED A MINIMUM OF FIVE <br />(5> FEET ABOVE THE PROJECTED POST-MINING WATER TABLE. <br />Stipulation No. 23 <br />IN ADDITION TO THE LARAMIE-FOX HILLS MONITORING WELL INSTALLED NORTH- <br />EAST OF THE ASH DISPOSAL CELLS, A MONITORING WELL SHOULD BE INSTALLED <br />SOUTHWEST OF THE ASH DISPOSAL AREA. ALL MONITORING WELLS MUST BE <br />INSTALLED AND FUNCTIONING AS DESIGNED PRIOR TO DISPOSAL OF ASH AT THE <br />MINE SITE. WELL LOCATION, DESIGN AND CONSTRUCTION TECHNIQUES MUST BE <br />APPROVED BY THE DIVISION PRIOR TO WELL CONSTRUCTION, FREQUENCY OF <br />MONITORING FOR ASH DISPOSAL MONITORING WELLS WILL BE MONTHLY AND <br />PARAMETERS TO BE ANALYZED FOR INCLUDE ALL PARAMETERS SAMPLED FOR DURING <br />THE PASTE EXTRACT ANALYSIS OF ASH SAMPLES PLUS ALL PARAMETERS INCLUDED <br />IN SAMPLING OF QUARTERLY WATER QUALITY SAMPLES. <br />Stipulation No. 24 <br />EACH YEAR, A MINIMUM OF ONE (1) REPRESENTATIVE FLY ASH AND ONE (1) <br />REPRESENTATIVE BOTTOM ASH SAMPLE SHALL BE COLLECTED FROM THE BOILERS AT <br />THE GOLDEN POWER PLANT. LABORATORY ANALYSIS WILL CONSIST OF SATURATION <br />EXTRACTS AND E.P. TOXICITY TEST FOR EACH SAMPLE. ADDITIONAL FLY ASH <br />AND BOTTOM ASH SAMPLES WILL BE COLLECTED AND ANALYZED IF, AT ANY TIME, <br />A SOURCE OF COAL IS CHANGED. RESULTS OF SATURATION EXTRACTS AND <br />TOXICITY TESTS WILL BE SUBMITTED TO THE DIVISION WITHIN 15 DAYS OF <br />ANALYSIS. <br />