My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-14_GENERAL DOCUMENTS - M1993041
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1993041
>
2004-09-14_GENERAL DOCUMENTS - M1993041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:43:37 PM
Creation date
11/23/2007 6:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
General Documents
Doc Date
9/14/2004
Doc Name
Compliance with Permit Stipulations
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PITCH CROSSING AGREEMENT <br />THIS AGREEMENT, is made this 21st day of November , 1994, <br />between Southdown, inc., a Louisiana corporation, (hereinafter <br />termed "Southdown"), and The Palmerton Consolidated Ditch Company, <br />a Colorado corporation, (hereinafter termed "the Ditch Company"). <br />W I T N E S S E T H <br />Southdown wishes to construct a box culvert across the <br />Palmerton Ditch ("Ditch"). The crossing will be located in the NE <br />1/4 of the NW1/4, Section 21, Township 3 North, Range 70 West, of <br />the 6th P.M. <br />NOW THEREFORE, it is mutually agreed as follows: ' <br />1. BOX CULVERT AND BRIDGE EASEMENT. The Ditch Company <br />consents to Southdown's installation, operation, and maintenance of <br />the box culvert and bridge within the Ditch and adjacent twenty <br />(20) feet. <br />2. DEBRIS AND POLLUTION. Southdown shall prevent any <br />pollutants, including but not limited to, trash, debris, and <br />construction material, from entering the Ditch and Ditch Easement <br />from the construction, operation, and maintenance of the box <br />culvert and bridge. <br />3. PLANS AND SPECIFICATIONS. Southdown shall be <br />responsible for construction of said box culvert and bridge and the <br />operation and maintenance thereof in a good, safe, and workmanlike <br />manner, according to plans and specifications approved and <br />initialed by the Ditch Company's engineers. Southdown agrees to <br />pay the Ditch Company $1,000.00 for crossing fees, and further to <br />reimburse the Ditch Company for its reasonable attorneys' and <br />engineering fees for preparation of this Agreement and review of <br />the plans and specifications, upon execution thereof. <br />4. LIABILITY. Southdown will construct, operate, and <br />maintain this box culvert and bridge in a manner which will not <br />interfere with irrigation water and flow in the Ditch. Southdown <br />shall indemnify and hold the Ditch Company harmless from any loss <br />or damage, to persons or property, arising out of the negligent <br />construction, operation, maintenance, and usage of the box culvert <br />and bridge, including attorneys' and engineering fees and costs, <br />except to the extent of the Ditch Company's own negligence or that <br />of its employees and agents. Southdown will be liable for any and <br />all loss or damage to the Ditch Company or its shareholders caused <br />by or related to the negligent planning, construction, operation, <br />maintenance and use of said box culvert and bridge, except to the <br />extent of the Company's own negligence or that of its employees and <br />agents. By virtue of entering into this Agreement, the Ditch <br />Company assumes no liability or responsibility for the <br />eY <br />
The URL can be used to link to this page
Your browser does not support the video tag.