My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50934
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:24 PM
Creation date
11/23/2007 6:23:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
6/8/1981
Doc Name
WSCS DEGASIFICATION PLAN
From
WESTERN SLOPE CARBON INC
To
BLM
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M1 _ <br />~ t <br />WESTERN SLOPE C/\Ii60N, INC. <br />P.o. aox Isis <br />SALT LAKE CIT V, VTAH 84110 <br />BO7~534.3600 <br />June 5, 1981 <br />Mr. Norm SlSlyerS <br />Department of the Interior <br />Bureau of Land Management <br />P.O. Box 1269 <br />Montrose, W 81401 <br />Re: WSC's Degasification P]an <br />Dear Mr. STryers: <br />iii iiiiiiiiiiiuii~ <br />RECEIVED <br />JUPJ 08 1931 <br />MINED LAND RECLAMATION ~ COAL <br />COLO. DEPT. OF NATURAL RESC::J7CE5 <br />The attached information is in regard to our degasification plan <br />undertaken at Western Slope Carbon. <br />An archaeological survey has been inducted for the new access <br />roads and drill hole locations for the area at the Fast Mine. A copy <br />of the report is attached. <br />A survey of the proposed drill holes and access road to hole <br />DH"K" above the west Mine will be conducted on June 8 and 9. The findings <br />will be fonaarrled to you as soon as the report is available. <br />As you knora, we have begun with preparation for drill hole "A". A <br />drill rig will be on site Wednesday, June 13, 1981. Our plans are to move <br />to drill hole "G" next, depending on the findings from drill hole "A". <br />Anticipated time of completion for each hole is about seven (7) days. W'e <br />are planning to have two drill rigs on site. The second drill rig will <br />be on the West Mine area. We will begin with drill hole "L" in that area <br />until the right-of~aay permit to obtain acxess to drill hole "K" is processed. <br />A reap sha.~ing all possible drill holes is attached, along with an <br />' explanation of our degasification plan. <br />For safety purposes we can not afford any delays in our plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.