Laserfiche WebLink
I~AR-26-9T 21:18 From:CCiU GOL~. 1T1966932~ T-394 P.O1/03 Joh-009 <br />~~~ ~~, ~~ <br />~~ ~~ <br />Berhan: <br />1. Please find copy of update for LVSCS as requested by Mr. <br />Humphries. <br />2. Please sign copy of Return Receipt for the Total Sulfur Data <br />sent February 21, 1997 and fax signed copy back. The Post office <br />separated the Return Receipt and it did not accompany the package. <br />3. Consider, with respect to the Technical Revision far the Phase <br />II Expansion that: <br />1. The Ore Liner System design remains the same. <br />2. The construction materials are the same as used in Phase <br />II, except for the structural fill. <br />3. The area is already disturbed and no additional <br />disturbance is proposed. <br />4. The surface water drainage outside the pad area is <br />lessened, and the resultant accommodated using tY.e same <br />principles as before. <br />S. Of course, the removal of the Carlton Mill was previously <br />approved. <br />