My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50774
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:19 PM
Creation date
11/23/2007 6:14:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
2/15/1994
Doc Name
MEMO-GEC EAST PIT COAL RECLAMATION PROJECT RN-MINES-322
From
DMG
To
BOB NONDORF
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: (3031 866-3567 <br />FAX: 1303) 832-8106 <br />MEMORANDUM <br />DATE: February 15, 1994 <br />TO: Bob Nondorf, Division of Purchasing <br />FROM: Maggie Van Cleef f~~ <br />RE: GEC East Pit Coal Reclamation Project <br />RN-MINES-322 <br />OF'CO~ <br />ti~ - 4b <br />NT ~i O <br />~~ <br />• ~ ~e]6 ~ <br />Roy ROmer <br />Governor <br />Michael 8. Long <br />Division Director <br />The GEC/East Pit Project was awarded to the low bidder, Colorado West Leasing, for the <br />revised amount of $350,252.52. A bid revised schedule for use when you issue the Purchase <br />Order is attached. <br />As you know, reclamation of the GEC mine is funded from a forfeited reclamation bond <br />posted by the operator under their mining permit. Thus, limited funds are available for <br />construction. Reclamation of the site was bid under two separate projects: the Orphan Pit <br />project was managed by Erica Crosby of the Coal Program, and the East Pit is being <br />managed by the Inactive Mine Program. Since reclamation of the Orphan Pit is not yet <br />complete, the total dollar amount for reclamation of the East Pit is not yet known. The <br />revised amount awarded represents the amount we can requisition for the East Pit at this <br />time. <br />The revised amount was arrived at by deleting Bid Items 17 and 18, equipment rental of a <br />Loader and a dump truck, respectively. This eliminated $1920.00 from the bid total of <br />$365,172.52. The additional $13,000.00 was eliminated from the bid total by reducing Bid <br />Item 14c, Revegetation, Mulching and Crimping, from 75 acres to 10 acres. <br />If you have any questions, please feel free to call me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.