Laserfiche WebLink
r <br /> <br /> <br />r,.;,~~~ <br />• ~IIII~II~~I~II~~II~ . <br />UNITED STATES DEPARTMENT OF THE IN'T'ERIOR <br />BUREAU OF LAND MANAGEMENT <br />SAN NAN [1ELD OFFICE <br />15 Burnett Court <br />Durango, CO 81301 <br />In Reply Refer to: <br />Received (co-o3x> <br />f ES Q 2 luog <br />The Friends Of South Montezuma Va].1ey, Inc <br />P.O. Box. 312 <br />Cortez, CO 81321 <br />Dear Ms Bell: <br /> <br />Stone Gravel Pit <br />'-'9 ,~ .j ....,.. r,.-rrr-,.-. <br />E. is ~ : s'... ~ ..:~ . ' ,'" .... tr <br />Pl;~l_It~ t~~~yL ~~~i'Y <br />I^iLE:.M - 47--o8g L <br />SITE: s~a~y G~aJCI ~If <br />The telephone confirmation of your conversation with Clyde <br />Johnson on December 18 (dated and faxed to us on January 6) is a <br />reasonably accurate representation of eur response to your letter <br />of December 16. That being the case, we will not reiterate that <br />information here. <br />However, we believe three issues need further clarification; <br />First, the presence of the dogs, day and night are not <br />considered to be incident to the mining operation and <br />Mr. Stone has been informed both verbally and in <br />writing to remove them (see attached letter to Mr. <br />Stone). <br />Second, the general objective of reclamation is to <br />leave the land in a condition where soils are <br />stabilized, vegetation is appropriate in type and <br />density for the ecological site, and a reasonably <br />aesthetic landscape remains. The requirements developed <br />by BLM for inclusion into the DMG permit are intended <br />to achieve those overall objectives. The success of <br />reclamation is measured by the results of activities <br />performed not the activities themselves. Consequently <br />spending the scarce time and resources of staff to do <br />things such as observing seeding operations, is <br />difficult to justify. Therefore, we were not present <br />during the seeding. The fencing of the disturbed area <br />is intended to keep livestock off the seeded area for a <br />time sufficient to re-establish adequate vegetation <br />(please see attached letter to the DMG for further <br />clarification). <br />