Laserfiche WebLink
19 Grassland cover standards 3/25/84 Satisfied <br />20 Seeding specifications mandated Satisfied <br /> (G) Reveg. success 1/25/85 need commitment <br /> evaluation plan on 4.15.8 <br />21 Reveg. monitoring plan 1/25/85 Satisfied <br />22 Backfilling and grading 5/25/84 Satisfied <br /> plan <br />23 Burial of toxic material 5/25/84 Technically satisfied <br /> plan (cover depth) Need to modify plan <br />24 Access road culverts 2/25/84 5/10/85 Div. needs to <br /> recheck submit. <br />25 Purgatoire river culvert 3/25/84 Satisfied <br />26 Refuse pile access road 3/25/84 5/10/85 Div. needs to <br /> recheck submit. <br />27 Permit revision - Road 1/25/85 need ripping <br /> reclamation plan to 18" <br />28 Adobe house survey quarterly NOT DUE UNTIL <br /> MNG IN AREA <br />29 Pillar stability 3/25/84 Satisfied <br />