My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50581
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:37:14 PM
Creation date
11/23/2007 6:05:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
11/6/1997
Doc Name
WEST ELK MINE LANDSLIDE
From
BARR ENGINEERING CO
To
NORM EVERY
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 6'97 15:19 FR BARR ENGINEERING 612 832 2601 TO 9295595--0626@16 P,06iI0 <br />To: Norm fivary <br />Rom: Philip B. 3olxns <br />6abjeoa Wa:t Ells Mime--Lamdalide <br />Dae« November 6, 1997 <br />Pfoiaet: 0828019AWW001 Pane 5 <br />pressure measurements on samples from I-6. Perform residual strength <br />tests using the direct shear test device on samples from I-7 and W-IC. <br />Perform moisture content, grain size and Atterberg limit tests on all <br />triaaial and duect shear test samples. Consider performing a swell test <br />using the odometer on samples for I-7 and I-6 (upper failure plane) to <br />determine the eapansive pressure of the soil and its potential to cause <br />`uplift". <br />(d) Evaluate the potential for water recharge from water "trapped" within <br />the substation retaining walls and upslope of the portal sheetpile wall <br />and determine methods to dewater such as horizontal drains. <br />(e) Evaluate the need for and the methods to drain water being "dammed" <br />by the 511 just upslope from the freshwater pond. <br />The above-mentioned action items will be used to stabilize and assess other <br />stabilization methods along cross section A-A. Based upon the assessment of the <br />stabilization methods at cross section A-A, the entire landslide stabilization <br />program will be determined. The approach is to clearly understand the mechanics <br />of the landslide at arose section A-A and apply this knowledge to the stabilization <br />of the remaining landslide area. <br />Schedule <br />1. Vertical pumping well at substation near W-1D and W-lE: <br />(a) pending permit-begin by Nov. 10 and complete by Dec. 1, 1997 <br />0828019\69881-LCET <br />
The URL can be used to link to this page
Your browser does not support the video tag.