My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-20_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2004-10-20_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 12:09:15 PM
Creation date
11/23/2007 6:00:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
10/20/2004
Doc Name
Proposed Decision & Findings of Compliance for RN4
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THOSE AREAS OF LAND, AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND <br />TO COVER RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. <br />NOTE: THIS IS ACTUALLY STIPULATION NO. 1(B) IN REAL LIFE. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 36: INSTALLATION OF METAL FLUME TO CONVEY RUNOFF FROM <br />NE PORTION OF WASH PLANT BENCH TO COLLECTOR DITCH LOCATED SOUTH OF <br />SHOP. OPERATOR TO SUBMIT REVISED MAPS FOR MR-40. SUBMITTAL SHOULD <br />INCLUDE MAP N0.24, 56. <br />Status: This stipulation was satisfied and terminated on 12 August 1988. <br />Stipulation No. 37: INSTALLATION OF HAUL ROAD CROSSING NEAR GUARD SHACK. <br />OPERATOR TO SUBMIT REVISED MAPS FOR MIt-41. THE SUBMITTAL SHOULD <br />INCLUDE REVISED MAP N0.27. <br />Status: This stipulation was satisfied and terminated on 5 August 1988. <br />Stipulation No. 38: INSTALLATION OF FOUR SHORT LIGHT DUTY ROAD SEGMENTS <br />TO ACCESS POWERLINE TRANSFORMERS. OPERATOR TO SUBMIT REVISED MAPS <br />FOR MR-42. THE SUBMITTAL SHOULD INCLUDE REVISED MAPS 27, 77 AND 109. <br />Status: This stipulation was satisfied and terminated on 5 August 1988. <br />Stipulation No. 39: INSTALLATION OF TEMPORARY ROADBASE STOCKPILE. <br />SUBMIT REVISED MAP N0.77 AND REVISED TEXT SECTIONS AS NECESSARY. <br />SUBMIT REVISED MAPSAND PAGES FOR MR N0.44. <br />Status: This stipulation was satisfied and terminated on 31 December 1988. <br />Stipulation No. 40: INSTALLATION OF ROADBASE STORAGE BIN AT EAST INTAKE <br />FACILITY. REVISE MAP NO. 85 AND REVISED TEXT AS NECESSARY. SUBMIT <br />REVISED MAPS AND PAGES FOR MR N0.45. <br />Status: Tbis stipulation was satisfied and terminated on 31 December 1988. <br />Stipulation No. 41: MOVE REFUSE SUBAREA N0.4 EQUIPMENT STORAGE SHED OFF <br />PILE SURFACE TO AN ADJACENT PAD. SUBMIT REVISED MAPS AND PAGES FOR <br />MIt. N0.46. SUBMITTAL SHOULD INCLUDE REVISED MAP SHOWING LOCATION <br />AND CONFIGURATION OF SHED, AND ALTERATION TO DITCH CONFIGURATION. <br />Status: This stipulation was satisfied and terminated on 15 January 1988. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.