My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50479
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:36:56 PM
Creation date
11/23/2007 5:58:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982154
IBM Index Class Name
General Documents
Doc Date
12/16/2002
Doc Name
Cost Summary Form
From
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES CosYEstimating Software <br />Date 16-Dec-2002 ~ Permit orjob no <br />User : SSS Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit or iob action :Routine Reclamation <br />M-1982-154 ~ Site : Farnsworth Gravel Pit No. 2 <br />none State :Colorado <br />M154-000 County :Delta <br />Cost <br /> <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />Ofa -Regrade processing/stockpile area grader 1 7.5 $549 <br />02a -Remove dike from river loader 1 7.1 $430 <br />03a -Transport equipment to/from site mobilize 2 2.2 $538 <br />04a -Dispose of mist debris demolish 1 3.0 $126 <br />InGutles inflation factor atllustment ot: NA <br />% <br />SUBTOTALS :~ 20.G <br />TOTAL DIRECT COST <br />OVERHEAD AND PROFIT - Llabillty IOSUfanCe : 1.55 ~ % Of d%reCt total = $25 <br />Performance bond : 1.05 % o/direct total = $17 <br />Job superintendent : NA` NA NA_ total = NA <br />Profit : 10.00 % of direct total = $164 <br />'not required (or eqp. operator serves as super) TOTAL O 8 P = $207 <br /> CONTRACT AMOUNT (direct 4 O 8 P) _ $1, 650 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracf/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $93 <br />CONTINGENCY- NA` NA total= NA <br />• contingencies accounted Por at task level ~ TOTAL INDIRECT COST = $300 <br /> TOTAL BOND AMOUNT (direct + indirect) = 51,943 <br />' <br />~ <br />~ <br />? <br />s. <br />z. &' asius-. "~tt$~°333TJ ,AY2t L <br />~M1 :_ ~& <br />
The URL can be used to link to this page
Your browser does not support the video tag.