My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50447
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:36:50 PM
Creation date
11/23/2007 5:57:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
General Documents
Doc Date
9/4/2003
Doc Name
DMG Acceptance of Bulkhead Design
From
DMG
To
Sunnyside Gold Corp
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 3, 2003 <br />To: Mr. Wally Erickson <br />From: James Dillie <br />Re: Bulkhead Design Review, Koehler Mine <br />Per your request, I reviewed the Koehler bulkhead designs that Mr. Steve Fearn submitted to the <br />Division. <br />As before, I did not verify Mr. Abel's design calculafions. <br />Mr. Abel's design report appears to follow the same criteria that were utilized at the Sunnyside <br />and Mogul mines (which, so faz, appear to be successful). The bulkhead needs to be designed <br />and constructed to contain acid mine drainage so the following design items are being <br />considered: 1. the bulkhead must be long enough and sufficiently sealed with grout to prevent <br />leakage along the concrete-rock contact and nearby fracture systems, 2. the bulkhead needs to be <br />thick enough to prevent shear failure or tensile failure, 3. the bulkhead needs to be located deep <br />enough to prevent hydrofracturing of the formation, 4. the bulkhead material needs to be <br />sufficiently acid resistant to last for some time interval and S. the bulkhead needs to be strong <br />enough to resist the effects of a maximum credible earthquake. According to Mr. Abel's <br />calculations, the Koehler bulkhead design meets all of the design criteria. <br />In my opinion, the bulkhead design for the Koehler tunnel is acceptable. <br />Sorry for the delay Wally. <br />cc: Harry Posey (e-mail) <br />
The URL can be used to link to this page
Your browser does not support the video tag.