My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50444
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:36:48 PM
Creation date
11/23/2007 5:57:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
General Documents
Doc Date
12/1/1999
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR SL3
From
Full Phase III
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION BOND HISTORY <br />The original reclamation liability for the CCM No. 1 was $250,000.00. The Division previously <br />reduced the reclamation liability by $150,000.00 through approval of a Phase I bond release of the <br />entire disturbed area, which was approved in December of 1990. The Division further reduced the <br />reclamation liability through approval of a Phase II bond release request on Ianuary 19, 1997 from <br />$100,000.00 to the current liability amount of $38,000.00. This final Phase III bond release <br />application proposes the release of the remaining $38,000.00 in bond liability and termination of <br />jurisdiction in accordance with Rule 3.03.3(1). <br />PROCEDURES AND SUMMARY OF THE REVIEW <br />PROCESS <br />Kaiser applied for a Phase III bond release under the Colorado Surface Coal Mining Act <br />following the final two years of vegetation sampling. An application for a Phase III release was <br />received by the Division on September 17, 1999. Kaiser published notice of the bond release <br />application in the Huerfano World once weekly for four consecutive weeks beginning August 19, <br />1999. The application was found complete on September 27, 1999, after the Division received <br />proof of publication of the applicant's required public notice. Kaiser also notified landowners <br />adjacent to the mine permit area and other interested parties of the pending application for bond <br />release as required by Rule 3.03.2(1). <br />Reclaimed land north of county road <br />
The URL can be used to link to this page
Your browser does not support the video tag.