Laserfiche WebLink
<br />,. - <br />Reporting Period July 4, 1997 -July 11, 1997 Page 3 <br />Data Collection <br />The fifth inclinometer survey for Borehole 97-4 was received, and a copy was given to you on <br />July 10. Additional drilling for locations #97-2 (inclinometer and piezometer) and #97-3 <br />(piezometer only) were completed on July 6 and 7. Laboratory analysis of soils collected at other <br />locations are still in progress. <br />If you have any questions or concerns, please feel free to contact me at (970) 929-2207. <br />Sincerely, <br />~<./ <br />Eric W. Mende <br />E-Seam Project Civil Engineer <br />EWM/ma <br />xc: :vlike Boulay - CDMG <br />Christine Johnston -MCC <br />Phil Schmidt -MCC <br />File <br />