My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL50349
DRMS
>
Back File Migration
>
General Documents
>
GENERAL50349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:35:02 PM
Creation date
11/23/2007 5:52:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
2/21/1983
Doc Name
STIPULATIONS MINING PN C-004-80 MCCLANE CYN MINE SALT CRK MINING CO
From
SHERIDAN ENTERPRISES INC
To
MLR
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;., <br />SHERIDAN EN~RPRISES, INC. <br />9746 East Hampden Avenue. <br />No. 3 60 <br />Denver, Colorado 80831 <br />(303) 761-0093 <br />February 21, 1983 <br />Mr. Jim Herron <br />Colorado Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />~ III IIIIIIIIIIIII III <br />~~.,- <br />!:, L 1 D <br />t F " 7 : i'..'. <br />e,n rn L., r.~n crr.~a~~e,i :fin <br />Re: Stipulations - Mining Permit No. C-004-80; <br />McClane Canyon Mine - Salt Creek Mining Company. <br />Dear Mr. Herron: <br />Pursuant to our telephone conversation of 2/17/83, this correspondence <br />should clarify whatever questions exist relative to McClane Canyon <br />stipulations. <br />A water monitoring program has been initiated, and includes analysis and <br />reporting of NPDES permitted sites. This program will be continued for the <br />life of the operation. <br />Some discussion transpired between you and our project engineer, John Walters, <br />as to the location of the new monitoring site on East Salt Creek. The <br />location will be presented to your office on an appropriate scaled map for <br />approval prior to installation. This matter should be resolved in the very <br />near future. <br />Soil samples have been taken in the fill areas and we are presently awaiting <br />analysis. It was stipulated that the sampling and analysis was to be accom- <br />plished within 5 months of permit issuance and obviously we have failed to <br />meet that deadline. It should be taken into account however that the purpose <br />for the required analysis was to determine suitability of soil materials for <br />reclamation. As the reclamation of McClane Canyon was identified as being <br />scheduled for the year 2011, one should reflect on the importance of missing <br />the stipulated date by 5 months. <br />Salt Creek has not finalized a configuration of the McClane Canyon work area, <br />and has no present plans to do so. It is requested that this stipulation <br />be dropped as Salt Creek will be incorporating such plans with the application <br />for the second permit term. It is anticipated that the configuration approved <br />by the Division will exist through this permit term. Any configuration, other <br />than that existing, will be submitted to the Division for approval prior to <br />construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.