Laserfiche WebLink
Mr. )ce Dudash, CDMG <br />Re: Topsoil Replacement Depths <br />Page 2 <br />Trapper is confident that average topsoil replacement depths meet at least minimum requirements <br />for all parcels reclaimed to date. This confidence is based primarily on the described field <br />monitoring system that ensures that minimum depths aze replaced as topsoil is laid down by <br />scraper crews. Notwithstanding our formal depth monitoring program, we do not have hard topsoil <br />depth sample data for parcels reclaimed between 1986 and 1988. Trapper feels that these <br />reclaimed lands meet minimum topsoil depth requirements as explained above, but we stand ready <br />to discuss and resolve this issue with DMG. <br />Please contact me at your eazliest convenience regarding this correspondence. <br />Sincerely, ~~ <br />Forrest Luke <br />Environmental Manager <br />FVL <br />p~d~ylh-0n61 <br />Encl <br />c File 109.2.3.3 <br />Bond rolease file. <br />