Laserfiche WebLink
AMENDED SUBSIDENCE EVALUATIONS SHALL INCLUDE THE PROPOSAL OF APPROPRIATE <br /> SUBSIDENCE MONITORING NETWORKS WITHIN EACH OF THESE DESIGNATED AREAS. <br /> STATUS: Future <br /> Stipulation No. 21 <br /> THE APPLICANT MUST INSTALL MONITORING WELLS IN, CONDUCT PUMPING TEST ON, <br /> AND MONITOR WATER LEVELS AND WATER QUALITY IN THE ALLUVIUM OF DRY <br /> FORK, LICK CREEK, SOUTH PRONG AND HORSE CREEK ONE YEAR PRIOR TO MINING <br /> WITHIN THE WATERSHEDS 01: THESE STREAMS. THE APPLICANT SHALL SUBMIT TO <br /> THE DIVISION THE DATA AND RESULTS OF THESE TESTS AND MONITORING ALONG <br /> WITH PROJECTED IMPACTS PRIOR TO CONDUCTING MINING WITHIN ANY OF THE <br /> WATERSHEDS. <br /> STATUS: Future <br /> Stipulation No. 57 <br /> WITH SUBMITTAL OF PERMIT REVISION NO. 6, MOUNTAIN COAL COMPANY HAS <br /> REMOVED ALL PERMIT DOCUMENT REFERENCES TO MINING BENEATH THE DRY FORK <br /> OF MINNESOTA CREEK INTERMOUNTAIN DIVERSION AND RESERVOIR SYSTEM, <br /> INCLUDING REFERENCES TO BUFFER AREAS AND ASSOCIATED SUBSIDENCE CONTROL <br /> PLANS. PREVIOUSLY APPROVED SUBSIDENCE CONTROL PLAN DOCUMENTS ARE <br /> MAINTAINED IN THE DIVISION'S FILES. <br /> THE DIVISION HAS NOT, AND WILL NOT, APPROVE ANY MINING WHICH WILL <br /> POTENTIALLY AFFECT THE DRY FORK OF MINNESOTA CREEK INTERMOUNTAIN <br /> DIVERSION AND RESERVOIR SYSTEM, INCLUDING ALL PREVIOUSLY DESIGNATED <br /> BUFFER AREAS, UNTIL AN APPROPRIATE SUBSIDENCE CONTROL PLAN IS SUBMITTED <br /> AND APPROVED. <br /> STATUS: Future <br /> Stipulation No. 58 <br /> MOUNTAIN COAL COMPANY WILL NOT INITIATE DISTURBANCE OR DRILLING AT <br /> EXPLORATION HOLE II UNTIL A MINOR REVISION IS SUBMITTED AND APPROVED <br /> WHICH PROVIDES U.S. FOREST SERVICE APPROVAL AND U.S. FISH AND WILDLIFE <br /> SERVICE CONCURRENCE FOR ACCESS TO AND DRILLING AT EXPLORATION HOLE II. <br /> STATUS: Future <br /> Stipulation No. 59 <br /> MOUNTAIN COAL COMPANY WILL CONTINUE TO WORK WITH THE DIVISION TO <br /> FINALIZE AN APPROPRIATE BOND AMOUNT IN A TIMELY MANNER. BOND AMOUNT <br /> FINALIZATION WILL PROCEED IN ACCORDANCE WITH THE REQUIREMENTS OF <br /> 3.02.2(4). <br /> STATUS: Future <br /> 3 <br />