Laserfiche WebLink
-; ._,.~ <br />~, ., <br />,,,, ,~,..., i. `~ ;. <br />a~~~~,.= <br />DEC 1 % 193? <br />n41NED LAP!J G-;; I_; •,i~~,'.l IGre <br />Colo. Dept. o! i~'sturat Oesoerce'• <br />SNOWMASS COAL COMPANY <br />Mine Ollice: P.O. BOx 960 <br />Carbondale, Colorado 81623 <br />(303) 963-3440 <br />Denver Orrice: Suite 2300 <br />410 Seventeenth Street <br />Denver, Colorado 80202 <br />(303) 825-7966 <br />December 15, 1982 <br />~II II~II~II~I~~~ ~I~ <br />Mr. Robert Liddle <br />Mined Land Reclamation <br />Department of Natural Resources <br />1313 Sherman Street, Room 423 <br />Denver, CO 80203-2273 <br />RE: Temporary Cessation of Mining Operations at North Thompson <br />Creek Mine #3, Permit No. 77-313 <br />Dear Bob: <br />This letter is written to you pursuant to regulation 4.30.1 of the Colo- <br />rado Mined Land Reclamation Board's Regulations. <br />On December 17, 1982, North Thompson Creek Mine #3 will be idled. One <br />man will continue to work at the mine to maintain airflow and fireboss, how- <br />ever, no production of coal will come from #3 mine. <br />The decision to idle the mine came after we realized that we can no longer <br />economically justify the operation of the mine during this slump in the world <br />coal market. Also, we realized that the manpower at #3 mine could be better <br />utilized in the development of our second longwall panel in #1 mine. As of <br />today, the anticipated date for reopening the mine will be the winter of 1983, <br />or the spring of 1984. However, these dates may change depending on the world <br />coal market. <br />Number 3 mine consists of 2.4 acres of affected surface area. The coal <br />has been mined from the outcrop downdip approximately 1,000 feet. The lateral <br />extent of the workings in #3 mine is approximately 3,500 feet along strike. <br />The highest amount of overburden has been 830 feet. <br />The surface facilities and the fan road will be maintained to accommodate <br />the fireboss who will continue to work at #3 mine. It will be necessary to <br />drive to #3 mine fan everyday to make a physical check of the fan because the <br />airflow in #3 mine will be maintained at all times. <br />