Laserfiche WebLink
.s <br /> <br />REVEGETATION <br />Seed <br />~~- 1 Fertilizer <br />~~~i,Y See fixtures <br />ll!! (Not n ded en <br />see pro 'ded by <br />OW R) <br />PROJECT OBSERVATION <br />1)~Seed will be supplied by MLRD <br />2) Seed will be supplied by CONTRACTOR <br />1) Chemical Fertilizer <br />2) Manure <br />#)~Both D ~ <br />i Pon osa P e Spruce/Fi 000-9000' <br />2) P' on-Juniper 000-7 <br />3) ubalpine/A1 pin ,000-12,0 ' <br />Other Seed hiix r (please at ach) <br />The PROJECT MANAGER will be at the project site periodically to monitor <br />construction activities and ensure that each work item is compieted and <br />constructed to design specifications. The following items must be observed <br />and approved by the PROJECT MANAGER before proceeding with additional work: <br />ADDITIONAL BID ITEMS <br />There are included on the Invitation and Bid sheet, several additional bid <br />items. These bid items are not guaranteed, and will be used only in the event <br />that conditions change on site, and only after approved by the PROJECT <br />MANAGER. The additional bid items for this project include: <br />1. <br />3 <br /> <br />