Laserfiche WebLink
James L. Schmieding <br />24 July 1979 <br />Project No. 0073-03-03-01 <br />Page 2 <br />during a flood, its course would be restored since the diversion <br />point for the Barnes Ditch is downstream of this area. However, the <br />river did not change course during the flood of 1976 and with the <br />100 feet of undisturbed area and the use of riprap in addition to a <br />loss of velocity due to excavation the river should return to its <br />present course after a flood. Therefore, I see no need fora 404 <br />permit from the Army Corps of Engineers. <br />I believe the enclosed items complete the requirements for Board consider- <br />ation. If there are any additional questions or requirements, please <br />feel free to contact me. <br />Very truly yours, <br />HOGAN AND OLHAUSEN, INC. <br />Glen D. Schlueter <br />GDS/cd <br />Enclosures <br />