Laserfiche WebLink
`---spa/02/9y 16:29 $9702114 DELTA COUNTY ~ III IIIIIIIIIIIIIIII <br />sss BOOS <br /> <br />DELTA COUNTY, COLORADO <br />~~ <br />BRADLEY K. KOI.MAN, COUNTY ATTORNEY <br />501 P/LLMER STREET -SUITE 105 - DELTA -COLORADO - 81416 <br />PHONE: 19701 874.2090 FAX: 1970)874-2174 <br />~I~ <br />1 <br />CENVER OFFICE <br />PUBLIC FILE COFY October 2, 1997 <br />FILE: .~yf - 7_~_~~~ <br />BY FAX TO (970) 247-5104 <br />SITE: Ell rso~ Pr ~- a <br />' ~ ~ v1 c; f 7~~ <br />Mr. Steve S. Shuey pFFN ICE ~ 4 1 <br />c~'~ ) /~~ ~ I" ~ S E <br />I <br />Dluaago Field Office <br />Division of Minerals and Geology L-c ~~ t~~ F r f 5 ~ r~ G ~` (~ tc u r <br />Colorado Departrnent of Natural Resources ~ <br />F101 ~~`~ at- <br />rAvenue <br />Bld <br />4fi4T <br />~~,~~~~ T~~ <br />~ <br />Qr~JJ~•°~' <br />, <br />ume <br />g. <br />r <br />/~ <br />Colorado 81301 ~' <br />Ihlran <br />o <br />g <br />, <br />I <br />Re: Ellison Pit - Permit No. M-78-170 <br />Request and information of stockpile materials ~C I ~ ~ <br />~C,._3_ ~ 7 <br />.~ <br />D~,;ar Mr. Shuey: `~ ~ ° C> '~~ . <br /> 5 SS <br />This letter follows up our telephone conversation of early this week. The situation is <br />modified slightly based upon information I have recently received. <br />Delta County has two stockpiles near the Ellison Gravel Pit within the presently permitted <br />ar~z. The first is a stockpile of sand which will be used for sanding roads following snows this <br />wining winter. That sand all came from the Pig Mesa Gravel Pit. Second is a small stockpile of <br />cold pazching material (oil and gravel). This stockpile will be used for patching. <br />It is the County's intention to bring additional road patching material to the County Shop <br />area for llistrict 1 to use within the next few weeks for road patching. The material will come <br />from the Lemoine Gravel Pit. Although it would be more efficient to stockpile this new material <br />at .the loc uion of the old stockpile (which is approximately 25 feet within the present permitted <br />bolmdaries) near the Shop area, it is probably possible to stockpile the new patching material <br />outside those present permitted boundaries, but within the proposed permit boundaries. <br />Vlrth respect to the road patch material, we presume that it will not be a problem for us to <br />bring in additional material to be used for road patching in the Delta area. We are not removing <br />any material from the Ellison Pit nor are we disturbing the area other than to locate materials on <br />thE; ground. The materials will be ultimately removed and will not rcquire any reclamation. <br />COUNTY34hury.doc <br />