Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />131 J Sherman SI., Room ? 15 <br />Denver. CO 80203 <br />Phone. (3031 866-3567 <br />FA%:(303)832-8106 <br />MEMORANDUM <br />DATE: November 16, 1993 <br />TO: Dave Leavenworth, Purchasing Division <br />FROM: Maggie Van Clef ,~,1~; <br />RE: GEC/East Pit Bond Coal Reclamation Project, Permit C-81-037 <br />pF Cpl <br />,,~ r <br />~~;,~b <br />. 4A ~ o <br />. I~~ <br />Roy Romer <br />Governor <br />Michael B Long <br />D~v~sion Direnor <br />On October 21, 1993, the Mined Land Reclamation Board issued a Board Order that <br />reclamation of the GEC East Pit be accomplished by the Inactive Mine Reclamation Project <br />according to the attached schedule. <br />In order to keep to the schedule the Board ordered, we anticipate using a Purchase Order <br />contract. A reclamation plan and cost estimate have been prepared, using the Technical <br />Information Processing System (TIPS). TIPS is supplied to DMG by the Department of the <br />Interior; Office of Surface Mining and contains over 20 different state-of-the-art <br />environmental engineering programs. The Reclamation Plan, preliminary maps and cost <br />estimate are attached. This Reclamation Plan will be the basis for the bid specifications. <br />The cost estimate for this project is $345,870.00. We do not believe that the job could be <br />bid in smaller sub-projects since Tasks 4 and 5, which must be included in one job due to the <br />planned movement of dirt, have a total estimated cost of $172,701.00. <br />On past jobs of this size and cost bid by the Division, you have expressed a desire to review <br />the specifications to see that they are adequate. Since we have a tight schedule to keep in <br />order [o comply with the Mined Land Reclamation Board Order, please let me know the <br />following: <br />1) If you wish to review the specifications; <br />2) When in the bid process you would like to review the specifications; and, <br />3) The time I should allow in the schedule for your review. <br />I will call you later this week to discuss this project. <br />