Laserfiche WebLink
Ms. Anne Beierle Page 5 September 12, 2002 <br />Attachments: <br />Table 1. Summary of Estimated Demolition Costs for the Henderson Conveyor <br />Appendix 1. Demolition Cost Calculations for the Overland Conveyor <br />Appendix 2. Demolition Cost Calculations for the Drive Building <br />Appendix 3. Demolition Cost Calculations for the Snow Shed <br />Appendix 4. Demolition Cost Calculations for Structures at Con3 (Wetland Crossing) <br />Appendix 5. Demolition Cost Calculations for Structures at Con9 (Stream Crossing) <br />Appendix 6. Demolition Cost Calculations for the Elevated Txestle at the Mill <br />