Laserfiche WebLink
HENDERSON MINE AND MILL -Costing Worksheet (Area i4) <br />Demolish Poweriines <br /> Location Adjust: <br />DMG Task # 14a 0.89 <br />Estimated Total Direct Cost <br />74a Demolish Powerlines <br />Main Ute 0.0 ft $2.06 $0.00 <br />West Fork 0.0 ft $2.06 $0.00 <br />East Fork 0.0 ft $2.06 $0.00 <br />Gravel Pft 2.0 poles $450,00 $801.00 <br />Pond Shop 8.0 poles $450.00 $3,204.00 <br />#1 Dam Light 44.0 poles $450.00 $17,622.00 <br />$19,248.03 <br />