Technical Memorandum, Anne Beierle, Henderson Mine, September 10, 2002, Page 2 <br />Results <br />2.67 acres of capping were completed, and, in my opinion, a good test of the geo- <br />synthetic materials resulted from the construction effort. <br />The cost for materials as reported by Tensar representatives for BX4100 and BX4200 aze <br />respectively: $0.09 and $0.16 per squaze foot. Mirafi HP370 was quoted to Climax at <br />$0.09 per square foot (personal communication with K. Kinnazd of Bowman on 9/12/01). <br />A cost estimate for installing all materials can be made from information collected by <br />EEE, based on real-life experience at Climax during this test plot study. Based on $20 <br />per man-hour for labor and assuming a 2-man crew for Tensar products and a 3-man <br />crew for Mirafi I4P370 (rolls aze too heavy for two workers to handle), the costs for <br />staging, laying, unrolling, anchoring with rocks, staples or ties is: (1) Tensar BX4100 <br />and Tensaz BX4200 Installation Cost = $0.02 per square foot and (2) Mirafi HP370 <br />Installation Cost = $0.016 per squaze foot. Transportation costs are $0.0041/ square foot <br />for BX4100 and $0.0069/squaze foot for BX 4200. Shipping is included in the Mirafi <br />cost of $0.09 /square foot number. <br />The total cost of material, delivery, and installation for each product is as follows <br />(assuming a one foot overlap between rolls and 4 feet on the ends = 7% additional <br />material needed): <br />Tensar BX4100 = $0.1141/ftZ or ($0.1141)x[43560 ftZ/ac+ (0.07x 43560)] _ $5318/ac <br />Tensar BX4200 = $0.1869/ftZ or ($0.1869)x(43560 ftZ/ac+ (0.07x 43560)] _ $8711/ac <br />Mirafi HP370 = $0.106 /ftZ or ($0.106) x [43560 ftz/ac+ (0.07x 43560)] _ $4940/ac <br />Summary and Recommendations <br />The objectives of the field study were met. That is, all three products were viable <br />alternatives to conventional capping. Costs for material and installation are on the order <br />of $4940 to $8711 per acre for the three products tested . <br />References <br />Bergado, Anderson, Miura, and Balasubramaniam. 1996. Soft Ground Improvement. <br />American Society of Civil Engineers Press, New York. <br />Ellis, M.D. August 1997. Reclamation Cost History of Climax Mine for the Period 1987 <br />through 1996. Ellis Environmental Engineering, Inc. Golden, Colorado. <br />Koerner, Robert M. 1997. Designing with Geosynthetics, Fourth Edition. Prentice Hall, <br />Upper Saddle River, NJ 07458. <br />Sheridan, Terry. 9/18/01. Letter to Ellis with budget costs for Tensar Products. <br />www.tensazcorp.com. Specifications for Tensaz Products. <br />www.mirafi.com. Specifications for Mirafi HP370. <br />