My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49846
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:38 PM
Creation date
11/23/2007 5:28:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
General Documents
Doc Date
9/20/2002
Doc Name
Clarification Letter for Reclamation Cost Estimate
From
Climax Molybdenum Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
303-279-8532 <br />303-279-1609 Fax <br />TECHNICAL MEMORANDUM <br />To: Anne Beierle and Tony Lucero, Henderson Mine <br />From: Mike Ellis <br />Date: September 10, 2002 <br />Subject: Henderson Tailing Pond Geo-Grid Installation <br />You asked that I submit the cost estimates as I finished with them to facilitate your <br />responses to DMG. The fourth one I have completed is the installation cost estimate for <br />geo-grids, which is attached for your perusal. My cost basis for this estimate is the study <br />I did for Climax Mine last summer on a 2.67-acre test plot on Robinson Tailing Pond. <br />Attached is a report that details the results-including costs-of the Climax test plot <br />study. <br />I computed ageo-synthetic cost of about $2,470,000 for the Henderson tailing facility. <br />This compazes with DMG's cost estimate of $3,984,046. <br />My back-up sheets and technical memorandum to you are attached. Call me if you have <br />any questions. <br />Attachments <br />Ellis Environmental Engineering, Inc. <br />4342 Ulysses Way <br />Golden, Colorado 80403 <br />
The URL can be used to link to this page
Your browser does not support the video tag.