My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49836
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:36 PM
Creation date
11/23/2007 5:27:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
2/28/1989
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b, The current plan requires monthly static water levels <br />and quarterly water quality samples from selected wells <br />as specified in Tab 15, Appendix 15-1, pages 15-1-9 to <br />15-1-11 of the permit revision application. <br />c. Three springs are being monitored at Nucla, two spoils <br />and one highwall. Monthly measurements of field water <br />quality parameters and semi-annual full suite water <br />quality samples are taken. No springs or seeps have <br />been discovered at Nucla East. <br />d. During the mining phase at Nucla East three piezometers <br />and one surface water monitoring site will be installed <br />within the first three years to evaluate drawdown <br />impacts along Calamity Draw and the West Lateral <br />Irrigation Ditch, In each of the fourth and fifth <br />years an additional piezometer will be installed to <br />bring the total number of piezometers to five. These <br />piezometers will be used for monitoring ground water <br />levels. The surface water monitoring site will be <br />located just upstream from mining disturbance in <br />Calamity Draw and will continuously record flow while <br />being periodically sampled for water quality. This <br />plan is discussed in Attachment 16-1, page 30 of the <br />permit revision application. <br />e. The post-mining ground water monitoring program will be <br />planned with CMLRD as a part of the site reclamation. <br />2. The applicant will conduct monitoring of surface water in a <br />manner approved by the Division, The monitoring plan was <br />submitted under 2.05.6(3)(b)(iii) and includes the <br />following: [4.05.13(2)]. <br />a. The baseline program (Nucla East-July, 1986 to July, <br />1987) included monthly visits to maintain, service, <br />take flow measurements, take field parameters and <br />collect full suite water quality samples. Results of <br />this program are discussed and tabulated in Tab 7 of <br />the permit revision application. <br />b. The current monitoring program will consist of monthly <br />field parameters and semi-annual full suite water <br />quality samples, <br />c. NPDES sites (sediment pond outlets) will have monthly <br />maintenance, service, flow measurements, field <br />parameters and full suite water quality samples. <br />d. Post mining monitoring will be largely unchanged. <br />Peabody will work with CMLRD in any changes needed or <br />desired. <br />-32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.