Laserfiche WebLink
<br /> <br />RECLAMATION COST SUhAIARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Taak No. <br />~ <br />~ Task Description Coet <br />I <br />~ l5) <br />SubtoCal IH): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description Cost ($I <br />~ I <br />I ~ <br />I <br />I <br />Subtotal ID <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />2 ~ Spread Topsoil over 92 acres <br />COs[ 1$1 <br />$12,192 <br />Subtotal (S): $12.142 <br />