My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49751
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:21 PM
Creation date
11/23/2007 5:23:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979059
IBM Index Class Name
General Documents
Doc Date
6/17/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ROADABLE EQUIPMENT: sheet 2 of 2 <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Coac/hr <br />____ ~____t a___ ___z _ _ _: <br />Subtotals 50.00 50.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- --------- <br />--------------------------- we[ght ownership Haul "ig Fleet Size Haul Trip Return Trrp DOT Permit <br />Non-ROadaDle Eqp. Deecript ion Itons) Cost/hr Cos[/hr Ino. hauled) Coe[/hr Cost/hr Coet/ea <br />Total Eqp. <br />Roadable Eqp. Description Cost )hr <br />Subtotals 50.00 <br />Fleet Size Haul Trip <br />Ino. hauled) Cos[/hr <br />Subtotals <br />EQUIPMENT HAUL DISTANCE fi TIME <br />i "~______==.=~o~=========ee==== <br />Nearest ma7 or city or town within proj ec[ area region: Loveland <br />Total one way travel distance - 5.0 miles. Average Cra gel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= <br />0.17 hours haul <br />0.50 hours unload <br />0. 1] hours return <br />JOB COST <br />Total Mob/Demob Cast = $1,129.1'1 <br />50.00 50.00 <br />Return Trip <br />Cos[/hr <br />$0.00 $0.00 <br />30.00 mph. <br />NjA hours load <br />0. 1T hours haul <br />N/A hours unload <br />o.n hours return <br />NOTE: Non-roadable equipment (haul rrg required to transport) mob/demob costs based on 2 round trips, each tr rp <br />cone iatrng of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig requ iced) <br />costs based on one round trip. Colorado DOT requires special permits for overe ize equipment on certain <br />apecif ied road segments within the State. Separate permits are required Eor each rig on each loaded trip. <br />Additionally, pilot care lone or two per rrg depending on tlegree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially £or eqv ipment which must De <br />partially dismantled £or transport and re-assembled at the job Bite. Coe is for lifting equipment and other <br />eupport equipment needed for this work shoultl be rncluded 1n [he mob/demob costa. <br />
The URL can be used to link to this page
Your browser does not support the video tag.