Laserfiche WebLink
acceptable as a bid guarantee. Bid guarantees, other than bid bonds, will be returned la) <br />to unsuccessful bidders as soon as practicable after the opening of bids, and (bl to the <br />successful bidder upon execution of such further contractual documents and bonds <br />(including any necessary coinsurance or reinsurance agreements) as may be required by <br />the bid as accepted. Failure to furnish a bid guarantee in the proper form and amount by <br />the time set for opening of bids may be cause for rejection of the bid. <br />If the successful bidder, upon acceptance of his bid by the OWNER, fails to execute such <br />further contractual documents, and give such bond(s) (including any necessary <br />coinsurance or reinsurance agreements) as may be required within ten (10) days after <br />receipt of the Notice of Award, the contract may be terminated for default. In such event <br />the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the <br />amount of his bid, and the bid guarantee shall be available toward offsetting such <br />difference. <br />List of Equipment Offered. The List of Equipment Offered form must be returned with <br />each bid. All equipment to be used on the project must be listed. The CONTRACTOR <br />must own, have a current lease for the equipment intended to be used to perform the <br />work, or must furnish a statement of arrangements to rent, or otherwise procure, adequate <br />equipment to perform the work. Inclusion of a piece of equipment on the List of <br />Equipment Offered represents a commitment to devote that piece of equipment to the <br />project work for the entire duration of the project. If several contractors propose to join <br />together to perform the work under this purchase order contract, equipment owned or <br />controlled by each should be listed and the owner identified. A purchase order contract <br />will not be awarded to a bidder who in the opinion of the OWNER (a) does not have <br />adequate equipment, or (bl does not have firm and satisfactory arrangements to obtain <br />adequate equipment to perform the work described in the Invitation and Bid. <br />BID AWARD <br />Award will be made with reasonable promptness, by written notice to the low responsive <br />and responsible bidder whose bid meets the requirements and criteria set forth in the <br />Invitation for bid. These criteria will include, but not be limited to the lowest GRAND <br />TOTAL PRICE, corrected if necessary for errors in price extension and/or addition, on the <br />Bidder's equipment if a List of Equipment Offered is required with the bid, and capability to <br />meet the performance time requirements. The GRAND TOTAL PRICE will be used for <br />comparing bids only. <br />PROJECT DATES <br />The project is scheduled for construction between July 8 through August 2, 1996. <br />TIME OF COMPLETION <br />The time of completion allowed for the project is 28 calendar days after receipt of the <br />Notice to Proceed. <br />3 <br />