My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49738
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:20 PM
Creation date
11/23/2007 5:22:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
10/30/1987
Doc Name
Proposed Decision & Findings of Compliance for RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PILE WILL NOT ATTAIN THE REQUIRED MINIMUM STATIC SLOPE SAFETY FACTOR OF <br />1.5, ENERGY FUELS MINING COMPANY SHALL REDESIGN AND RECONSTRUCT THE THEN <br />EXISTING EMBANKMENT TO CONFORM WITH THE DESIGN SUBSEQUENTLY APPROVED BY <br />THE DIVISION. <br />IN SUCH EVENT, IF AN ACCEPTABLE REDESIGN HAS NOT BEEN APPROVED BY THE <br />DIVISION WITHIN 90 DAYS FOLLOWING THE SUBMISSION OF THE ORIGINAL REQUIRED <br />STABILITY ANALYSIS, ENERGY FUELS MINING COMPANY WOULD BE REQUIRED TO <br />CEASE DEPOSITION OF COAL PROCESSING WASTE. <br />Stipulation 3: <br />ENERGY FUELS MINING COMPANY WILL COMPLETE A SURVEY DESCRIBING THE <br />POTENTIAL EFFECT ON THE STRUCTURE (AMENDED COAL PROCESSING WASTE PILE) <br />FROM SUBSIDENCE OF THE SUBSURFACE STRATA RESULTING FROM PAST UNDERGROUND <br />MINING ACTIVITIES AS REQUIRED BY RULE 2.05.3(8)(a)(i)(D). ENERGY FUELS <br />MINING COMPANY SHALL SUBMIT THAT SURVEY, FOR REVIEW BY THE DIVISION, NO <br />LATER THAN ONE YEAR FOLLOWING RETURN OF THE MINE TO ACTIVE MINING <br />STATUS. THE OPERATOR SHALL RESTRICT PLACEMENT OF COAL PROCESSING WASTE <br />TO THAT AREA DELINEATED ON THE MAP SUBMITTED AS A SUPPLEMENTAL AMENDMENT <br />TO THE TECHNICAL REVISION APPLICATION, UNTIL THE DIVISION HAS APPROVED <br />THE SUBSIDENCE SURVEY. IN THE EVENT THAT THE REQUIRED SUBSIDENCE SURVEY <br />WERE TO DETERMINE THAT THE PROPOSED AMENDED COAL PROCESSING WASTE PILE <br />MIGHT POTENTIALLY BE DAMAGED BY ANTICIPATED SURFACE SUBSIDENCE, ENERGY <br />FUELS MINING COMPANY SHALL REDESIGN THE PROPOSED AMENDED EMBANKMENT TO <br />RENDER THE DESIGN ACCEPTABLE TO THE DIVISION. <br />Stipulation 4: <br />WITHIN 60 DAYS OF APPROVAL OF THE APPLICATION TO RENEW THE ANIMAS MINE <br />PERMIT, ENERGY FUELS MINING COMPANY WILL IDENTIFY ALL ROADS TO BE USED <br />WITHIN THE PERMIT AREA, ASSIGN ACCEPTABLE DESIGNATIONS OF USE FOR THESE <br />ROADS, PROVIDE ACCEPTABLE DESIGN AND CONSTRUCTION PARAMETERS FOR ALL <br />ROADS CONSISTENT WITH THEIR DESIGNATIONS OF USE, AND SUBMIT MAPS <br />ILLUSTRATING THE LOCATIONS OF THESE ROADS AND THEIR DESIGNATIONS OF USE <br />FOR ALL COPIES OF THE PERMIT APPLICATION IN THE DIVISION'S POSSESSION AND <br />AVAILABLE TO THE PUBLIC. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.