Laserfiche WebLink
<br /> <br /> <br />- Three piles on south side of the permit 7,500-8,000 yrd.3 <br />area [the easternmost pile appears <br />identical to the central pile, and is <br />included in the volume calculations. <br />(pile A, B, and unlabeled pile). <br />- Long, low pile parallel to western 150 yrd.3 <br />fence line (pile D). <br />- Large pile on northwest side adjacent 5,100 yrd.3 <br />to residence (pile C). <br />- Pile at northeast corner of permit <br />3 <br />area (pile E). 600-700 yrd. <br />Total Stockpiled 13,350+yrd.3 <br />Additional Volume of Soil Available <br />- Topsoil below process area. 1,448 yrd.3 <br />- Other topsoil in areas not yet mined. 2,900 yrd.3 <br />4,348 yrd.3 <br />*Using a mean estimated thickness of 6 inches available. <br />The estimates are thus probably conservative. <br />As we discussed on site, this should remove the matter from further <br />regulatory actions at this time regarding the issue of soils. <br />Please feel free to contact me if you have any further questions. <br />Sincerely, <br />CC: Robert Siegrist <br />Robert Fleming <br />Joe Weaver <br />JS/jc <br />~~5~ <br />Michael Stanton <br />For Henderson Development Company <br /> <br />