Laserfiche WebLink
-4- <br />~~ Federal Lease D-047201 <br />T.2rt., R.lOW. bih pm <br />Sec. 3: S 1/2 SE 1!4 <br />Sec. L0: NE 1/4 t.c 1/4 <br />Federal Lease C-023703 <br />T.2N., R.lOW., 6th pm <br />Sec. 3: E 1/2 SE 1/4 SW 114 <br />17. Upon approval of Departmental action [lie operator will submit within 30 <br />days plans for construction of powerlines using approved guidelines for raptor <br />protection. <br />18. Upon approval of Departmental action the operator within 30 days c.•ill <br />cocmmit to not using persistent pesticides unless approved by the regulatory <br />authority and [o fence any ponds that contain toxic materials. <br />19. With respect to vegetation resampling in the 1981 field season, site 50 <br />(Colorado {Jildrye) and its reference area will be sampled for herbaceous cover <br />and production. Site 60 (Juniper) will be sampled for shrub density and for <br />_ production. Site 41 (Sagebrush-Grass) and site 40 (Greasewood-Sagebrush) and <br />corresponding reference sites will be sampled for production. Data summaries <br />and statistical analyses must be submitted to the regulatory authority by <br />October 1, 1981.• This shall apply for all sampling conducted during 1981. <br />~i• 20. With respect to vegetation sampling during [he 1981 field season in areas <br />to be disturbed by refuse disposal units 1-4, tiie number of sample clusters <br />within each vegetation type shall be as specified on page 24-7 of Illustration <br />24. Corresponding reference areas must also be sampled for applicable <br />parameters. The size and location of proposed reference sites must be <br />submitted to the regulatory authority within 30 days of approval. The <br />reference area which will represent the area presently occupied by the <br />Cheatgrass-Annual Forb community must be specified. <br />21. Disturbed acreages of each vegetation <br />mentioned on page 24-8 shall be calculated <br />authority within 30 days of approval. The <br />will be set by the regulator}• authority at <br />size and location of proposed reference si <br />above deadline. <br />type affected by the sites <br />and submitted to the regulatory <br />number of sample clusters requited <br />the time. A map indicating the <br />tes shall also be submitted by :tie <br />22. With respect to evaluation of species diversity nn reclaimed lands, <br />Western Fuels is required to work with the rcl;ulatory authority towards the <br />establishment of mutually acceptable success criteria. Such criteria must be <br />formulated and agreed to no later than January 1, 198?. Section F on page <br />V-Sla shall be revised accordingl}•. <br />Willi respect to the use of reference areas and range site descriptions in <br />determination of re vegetation success, the procedures outlined in cowmen[ 5 of <br />the April 20, 1981 letter to Western F els are to be followed. Reference <br />areas in poor condition are to be fenced. If a condition check at the time of <br />bond release indicates that [he reference area is still in poor condition, <br />