My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49714
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:29:17 PM
Creation date
11/23/2007 5:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
7/21/1981
Doc Name
Approval of Federal Permit w/stips No. CO-0038
From
OSM
To
WESTERN FUELS ASSOCIATION INC
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Perini[ Kumber CO-0038 <br />Attachment 1 <br />SPECL4L S;IPUL,",.'IONS <br />OS11 and Colorado dined Land Reclamation Division have idenCif~ed the following <br />stipulations (conditions of approval) which are needed to ensure the :SP,P <br />complies with Federal and State regulations implementing S;1CRA. The term <br />"regulatory authority" means the Colorado toned Land Declamation Division and <br />the Department of the Interior, OSC1, unless otherwise specified in the <br />Colorado permanent program agreement. <br />1. The applicant shall o'otain rights -of -way from BLt1 prior to the <br />construction of off-leas roads, transmission lines, water lines, and <br />facilities and for third party facilities on the leases. <br />2. Upon completion of production mining within the easternmost portion of <br />room and pillar panel R.P.I-D and the easterr. half of longwall panel L.W.D.-1, <br />the applicant shall analyze the subsidence monitoring data collected to that <br />date. No production mining shall commence within anv additional panels until <br />chat report has been reviewed and approved by the regulatory authority. If <br />the results of that analysis determine that a revision of rite mining plan for <br />the remainder of the mine is appropriate, the applicant shall complete the <br />_ appropriate revisions and submit them to the regulatory authority for review. <br />No production mining shall commence within any additional panels of the mine <br />until that revision has been approved by the regulatory authority. <br />3. Witfiin 30 days of acceptance o`. Departmental approval of the mine plan, <br />~r'd the applicant shall ensure that their cultural resource contractor has <br />sufficiently documented the 17 "potentially" eligible sites so that OS:1 may <br />submit a request for eligibility or non-eligibility concurrence for these <br />sites to the Colorado SHPO. The initial documentation on the eligibility test <br />program may be in draft form and concern itself only with the question of <br />eligibility. A brief final report on the testing program should be submitted <br />no later than 90 days from acceptance of Departmental approval of the mine <br />plan. <br />4. Following SNPO review and concrrence with the eligibility assessments, OS:1 <br />will provide Western Fuels with a list of sites chat have been determined <br />eligible. Within 60 days of receipt of this eligibility list Western Fuels <br />will submit a site specific mitigation plan for those eligible sites for <br />regulatory approval. <br />5. The operator shall implement [he mitigation procedures specified in <br />Stipulation 114 in strict adherence with the objectives, methods, and <br />techniques specified in the mitigation proposal approved by the regulatory <br />authority and the Colorado SHPO. The plan shall be implemented in accordance <br />with Part II of the Advisory Council's "Guidelines," and any deviations from <br />the approved proposal must first be submitted to rile regulatory authority, for <br />approval. A draft report of the data recovery shall be submitted for review <br />and approval to the regulatory authority and the SI1P0 prior to any surface <br />coal mining and reclamation activities at or adjacent to anv of the eligible <br />! sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.