Laserfiche WebLink
SLOPE STABILITY <br />]INTERIM I2iSPECTION REPORT <br />AREA <br />TIME <br />if Creek Drainaoe Fill <br />DATE <br />• <br />2-5-86 <br />1 <br />2. <br />3. <br />9. <br />5 <br />6 <br />?. <br />8. <br />9 <br />Debris, organic matter, coal, etc., present in fill none visible <br />General gradation and characteristics of material gradation of core and wooer <br />Presence of water, surface end ground none oresent in the active oit or <br />_ _ emerging from the underdrain. <br />Condition of underdrain (approx. current width, depth and length), material graduation <br />and characteristic, compaction, presence of water current placement approximate- <br />ly 20' - 25' wide by 15' - 20' deep. <br />General material movement none evident <br />Proximity and treatment of seep points none <br />Condition of slope fill surface (grading, cracks or sloughing, erosion, revegetation_ <br />none <br />Recommendation continued observation <br />Accountability <br />1 declare the preceding observations and notes true and accurate to the best <br />of my knowledge. <br />I~n~ l J,J~n _ Z-19 -8(a <br />Richard A. Isaac Date <br />Colorado P.E. 20320 <br />