Laserfiche WebLink
<br /> <br />Permit Number CO-0012, 4/83 <br />Page 2 of 6 <br />and to conduct underground and reclamation operations connected with <br />underground mining on the foregoing described property subject [o the <br />conditions of the .lease(s), [he approved mining and reclamation plan <br />(AfRP), and Colorado State permit C-038-83, issued April 20, 1983, <br />including all stipulations, and all other applicable conditions, laws <br />and regulations. <br />Sec. 3 This permit is issued for a term of 5 years commencing on the date <br />the permit is signed by the permittee, except that [his permit will <br />terminate if the permittee has not begun the underground coal mining <br />and reclamation operations covered herein within 3 years of the date <br />of issuance. <br />Sec. 4 The permit rights may not be transferred, assigned, or sold without <br />the approval of the Director, OSM. Request for transfer, assignment, <br />or sale of permit rights must be done in accordance with 30 CFR <br />741.25. <br />Sec. 5 The permittee shall allow the authorized representatives of the <br />Secretary, including, but not limited to, inspectors, fee compliance <br />officers, and [he Colorado Mined Land Reclamation Division caithout <br />advance notice or a search warrant, upon presentation of appropriate <br />credentials, and without delay to: <br />a. Have the rights of entry provided for in 30 CFR 840.12 and <br />842.13; and, <br />b. Be accompanied by private persons for the purpose of conducting <br />an inspection in accordance with 30 CFR 842, when the inspection <br />is in response to an alleged violation reported by the private <br />person. <br />Sec. 6 The permittee shall conduct underground coal mining and reclamation <br />operations only on those lands specifically designated as within [he <br />petviit area on the maps submitted in the MRP and permit application <br />and approved for the term of [he permit and which are subject to the <br />performance bond. <br />Sec. 7 The permittee shall minimize any adverse impact to the environment or <br />public health and safety resulting from noncompliance with any term <br />or condition of this permit, including, but not limited to: <br />a. Accelerated monitoring [o determine the nature and extent of <br />noncompliance and the results of the noncompliance; <br />b. Immediate implementation of measures necessary to comply; and <br />c. k'arning, as soon as possible after learning of such <br />noncompliance, any person whose health and safety is in imminent <br />danger due to the noncompliance. <br />