Laserfiche WebLink
STIPULATICd1S <br />WESTERN FUELS - UTAH, INC. <br />DESERADO MZ11E <br />1. PRIOR TO ISSUAA'CE OF A PERMIT TO CONDUCT FfINING OPERATIONS, TXE APPLICANT <br />hfJST <br />(a) SUBMIT A PERFORMANCE BOIJD PAYABLE TO THE STATE AND THE U.S. GOVERNMENT ZN <br />AN AMOUNT CONSISTENT WITH THE REQUIREFIENTS OF (b) BELOW AND THE RECLAMATION <br />COST ESTIMATES CONTAINED ZN THE APPLICATION. <br />(b) SUBFI7T A MAP SXOtdING EACH AREA OF LAND ON THE PROPOSED PERMIT AREA FOR <br />k71ICX A PERFORMANCE BOND WILL BE SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES <br />TO OCCUR ON THOSE AREAS OF LAND, AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND <br />TO COVER RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. <br />2. UPON COFIPLETION OF PRODUCTION FfINING WITHIN THE EASTERN MOST PORTION OF <br />ROOM AND PILLAR PANEL R.P.I-D AND THE EASTERN HALF OF LONGWALL PANEL L.W.D.-1, <br />TXE RPPLICAF7T SHALL PREPARE ANALYSIS OF THE SUBSIDENCE MONITORING DATA <br />COLLECTED TO THAT DATE. NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS UNTIL THAT REPORT HAS BEEN REVIEWED AND APPROVED BY THE <br />REGULATORY AUTHORITY. IF THE RESULTS OF THAT ANALYSIS DETERMINE THAT A REVISION <br />OF TXE MINING PLAN FOR THE REMAINDER OF TXE MIl7E IS APPROPRIATE, THE APPLICANT <br />SHALL COMPLETE THE A.~PROPRIATE REVISIONS AND SUBFIIT THEM TO THE REGULATORY <br />AUTHORITY FOR REVIEW. ~~NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS OF TXE MINE UNTIL THAT REVISION XAS BEEN APPROVED BY THE <br />REGULATORY AUTXORITS'. <br />3. 110 SUBAREA OF TXE REFUSE DISPOSAL AREA SHALL BE DISTURBED BY MI1JI11G <br />:-.C=?['?'_TES L";S"I T.°.E ~3?_?Ci,1:T S,;.S DE.'~:O\'STR~:'=D TO TYE REGULATORY AUTHORITIES' <br />SATISFACTION THAT S;IFFZCIENT NON-TOXIC MATERIAL IS AVAILABLE TO COMPLY WITH <br />RULE 9.10. <br />4. A PLA11 A'UST BE SUBI?ITTED TO THE REGULATORY AUTHORITY [JZTHIN 30 DAYS OF <br />APPROVAL OF TN IS FfIA'E PLAN FOR THE HANDLING AND DISPOSAL OF MATERIAL IN TXE <br />"STORAGE AREA" AND A POST-MINING TOPOGRAPHIC MAP OF THE RAILROAD STORAGE AND <br />LOAD OUT AREAS. <br />5. TXE APPLICANT i9ILL INCORPORATE OVERBURDEN ANALYSIS SUBMITTED TO TXE <br />REGULATORY AUTHORITY ON MAY 29, 1981, INTO TXE FfINE PLAN WITHIN 30 DAYS OF <br />APPROVAL OF THE PERMIT. <br />6. THE APPLICANT M. UST SUBFI_rT A MONITORING PLATY FOR THE k*dITE RIVER ALLWIU.M <br />-- -.~C.?= _.:.-._ _ _:, _='1'. ::.~.?EC_IO'~C :_.-. .';D JARGER .-,... AT; 'ICIPATED, .=.:;D THAT <br />_..E F:O;;ITORIIIG GBJc-CTIG'ES OF SECTION 414.5 OF TXE COLORADJ PER+L~.NEA'T REGULATORI' <br />PROg~•„y p~ n;Em_ T-;rc rT;FOR~_~TIO'~' F:JST BE SL'BF:ITTED TO TXE REGULATOR2' AUTHORITY <br />i•:i~5?.': 90 D.;:'S OF Try GRAl7TIYG OF THE PER^:IT. <br />7. TXE A_nPLICAA'T h ~'ST AZ50 COFIF;IT TO PROVIDIA'G A F;iTIGAT20IJ PLAN SHOULD THE <br />EFFECTS OF ORA[~~Da+'TJ IN THE 0.'FfI TE RII%cR ALLLNiAL AQL12FER DETRIMENTALLY EFFECT <br />ESTABLISHED AGRICULTURAL ACTI[ITIES, EITHER TXROL'GH UNFORESEEN IhfPACTS OR FRO.'~f <br />GRO UF7D47ATER DEPLETIONS LJXICH ARE LARGER THAN EXPECTED. <br />