Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />Bower, Erich <br />From: Brence, David <br />Sent: Monday, June 25, 2001 9:02 AM <br />To: Valdez, Hurby; Keskimaki, Kurt; Wagner, Rich; Long, Dave; Bower, Erich <br />Cc: Brence, David; Ives, Bob <br />Subject: Crusher fill volumes. <br />Note these are estimates based on best guess filling arrangements and 34 degree angle of repose. <br />Filling of crusher pocket and train dump section = 5453 Cu yd. <br />Three foot coverage over everything = 412 Cu yd. <br />Filling under Ducon section = 755 Cu yd. <br />Elevator shaft fill = 1092 Cu yd. <br />Crane access fill = 1622 Cu yd. <br />Stair well (if stripped out) = 1963 Cu yd. <br />Mantle storage penetrations = 427 Cu yd. <br />Tolal if all is done = 11724 Cu yd. <br />Total with 30% setting = 15241 Cu vd. <br />t <br />