My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49404
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:28:18 PM
Creation date
11/23/2007 5:06:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
2/11/2005
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description of the Operation and Reclamation Plans <br />During operations, coal was mined from five portals in the Lower Starkville seam using <br />the room and pillar method. Both conventional and continuous equipment was used. <br />Coal was transported to the surface on a belt conveyor. Coal was stockpiled and <br />transported to the preparation plant or to customers directly. Refuse from the prep <br />plant was permanently deposited in the refuse pile located in the northwest portion of <br />the disturbed area. <br />Following permanent cessation of mining, reclamation activities were undertaken. <br />Structures were dismantled, the Mine No. 2 highwall was backfilled and graded, topsoil <br />was replaced in portions of the disturbed area and revegetated. Approximately 17.3 <br />acres of disturbance was not covered with topsoil but with a suitable soil substitute. <br />Two loadouts, the Burlington Northern loadout and the Santa Fe loadout, located in city <br />of Trinidad, have been reclaimed and bond has been fully released. <br />Section II -Revisions to the Permit <br />There have been no permit revisions, technical revisions, minor revisions, or bond <br />releases applications submitted since Permit Renewal No. 4 (March 2003). <br />Section III - Summary of Stipulations <br />The following table is a summary of all stipulations issued over the life of this permit. <br />Stipulations are a binding part of the mining permit. <br />Stip # Brief Description Status Date Comments <br />1 Non-toxic refuse demo CW 01/17/88 <br />2 Refuse pile stability CW 01/17/88 <br />3 Subsidence effect CW 01/17/88 <br />4 Mine roads CW 09/20/88 <br />5 Additional bond for roads CW 09/30/89 <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.