Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />DIYISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1713 Sherman SL, Room 215 <br />Denver. Colorado 80201 <br />Phone: UU SI 8hG~356~ <br />cnx:aoJ)eJra)nb <br />STATE OF COLORADO <br />RECEIVED <br />NOV 13 1997 <br />Division of Minerals & Geology <br />IMP <br />November 12, 1997 <br />TO: McARDLE, D[VIS[ON OF MINERALS & GEO <br />FROM: (~~~ KRABACHER, DIVISION OF MIl~RALS & GEO <br />RE: GRASSY GAP FORFEITURE, P.O. # PKA 98000000004 <br />I~~~~ <br />DEPARTMEM OF <br />NATURAL <br />RESOURCES <br />ftoy Romer <br />Governor <br />(amen 5. Lachhead <br />Eaecuiive Onecta <br />Michael 8. lmg <br />prviuan Duecror <br />The maintenaace work perfomred onRockcastle Coal .Company's C'aassy Gap site was <br />completed on November 6, 1997. The DSH only worked l4 hours as shown on the Equipment <br />rental sheet. All mad maintenance wodc was completed as directed by I Rinnc of the Coal <br />Program as well as the trash removal, standpipe repair, road base installation and riprap <br />placement per~'1eldDirective #Iand Change Order #L The SD.c.y. nftoad haseas.specified <br />under Item #S only was spread out over an approximate 240 lineaz foot stretch versus the <br />approximate SDOl£ as unshed, hut_the~nal resultaccomplished what wasneeded onJheaccess <br />road comer in question. DSH time primarily included work which involved the shaping and . ~ <br />smoothing oferoded pitaccess roads, aligaing runoff with.ditch work, and cleacungvut water ~ •-6'°" <br />baz crossings. The_ standpipe repair included the sealing_off of the exterior and interior bypass ~~,,,~,~ . <br />holes. Two sepamteapQroximate IDOl.F-~+i~n~:ofxrnded ditrh~4"~inusIIVernock ~~~+'' <br />`p alai ced one lift tttick. And 6nalty the trash removal included the off-site disposal of the +20,000 <br />gallon watersank which uYenuosalyage, 3 8'~iameter off-roadliaul tiresfandmiscellanenus CSP <br />and iron. The azea where the trash was removed from was ripped and revegetated as well as the <br />improved section ~fShe accessmad. Theawarded ~onrrar-r~0~ ri-won, rnmplPra~ rhP ~e <br />work for $6,321.00, including the 5938.00 increase for the delivered and placed riprap. This was <br />5344.00 over.the bidFuuice ofSS,977A0. <br />