Laserfiche WebLink
February 10, 1998 <br />ROAD AND BRIDGE DEPT. <br />P.O. Box 147 <br />FAIRPLAY, COLO. 80440 <br />719-836-2771 • 303-838 7509 ext. 636 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />FEB 11 1998 <br />Attn: Jim Stevens ~ Y~~ <br />Dear Mr. Stevens: <br />PARK COUNTY <br />iii iiiiiiii~iiiii~i <br />Division of Minerals & Geology <br />~n-approxirmateF~~ruary 1st, we started some backfill operations at our <br />Flat Pit, M-80-~~1.. __ he following information is for your office according to <br />a.} The proposed activity is at M-80-251 Ansley Flat Pit, south of Fairplay, on <br />Highway U.S. 9,,approximately 3 miles. <br />b.} There is approximately 1000 yards of inert material from a new road <br />construction project in Fairplay, Colorado. <br />c.) f, certify this m~teriart~nts or exceeds the requirements of 1.1 <br />(20). signed., ~~I~ ~~// ~~ <br />d.) We started this process on or about February 2, 1998, and hope to be <br />completed by the end of February, 1998. <br />e.) The slopes will be 3.1 or less in most of the North and NE area of the <br />disturbed area of the pit. <br />f.) Most of the material will be placed with a front end loader and back dragged <br />with the bucket and wheel packed, it will then be covered wdh 6 to 8 inches of <br />topsoil and seeded probably in the fall of 1998. <br />If you have any questions or I pn be of further assistance, please contact <br />me at my office at (719)836-4283. <br />Sincerely~~d~~ <br />Konrad O.Oker Sr., Field Operations Supervisor <br />Park County Road and Bridge <br />