Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Batch Weigh Loadout <br />Haul Road <br />Location: Foidel Creek Mine <br />Client: RAG <br />Project No.: 02-5023 <br />Report No.: 2 <br />Date: 9/13/02 <br />Time: 1.5 <br />Mileage: 40 <br />EngrJTech: JK <br />Work Performed: <br />As requested, we visited the project site on this date to conduct nuclear density testing on the roadway <br />embankment fills. At the time of our visit, the surface of the roadway subgrade was saturated due to recent <br />precipitation. There were no equipment operators present to subexcavate to undisturbed compacted fill for <br />testing. Additionally, it appeared that embankment subgrade fill operations were complete. We will return on <br />another date to conduct nuclear density testing. <br />Verbal Discussions: <br />Dave Wallace of Twentymile Coal Company was not present on this date. <br />