Laserfiche WebLink
<br />Mr. Bryan Archer <br />-3- <br />August 8, 1986 <br /> <br />Table 1. Bond Requirement <br />Meadows N~f ut Road and Facilities Area <br />Haul Road <br />Erosion/Planning Study E 10,000.00 <br />Drainage Control Construction E 11,440.35 <br />Gully Repair S 7,630.49 <br />Road Grading and Surfacing S 32,317.60 <br />Revegetation E 35,188.40 <br />Maintenance E 82,000.00 <br />Mobilization S 4,602.66 I~ <br />Facilities ~ ~ <br />Demolition S 24,861.00 ~~ <br /> <br />Regrading <br />S <br />3,863.52 ~ <br />Topsoil S 4,893.28 <br />Revegetation S 1,853.50 <br />Indirect Costs E 45,349.20 <br />Total 5210,000.00 <br /> <br /> ~~~ ~ <br />\ I. <br /> <br />f1 <br /> <br />~ _ <br /> <br />~~, ~ . <br /> ~ <br />~ <br />_--~- ~ 1 <br />. <br /> <br /> ~~- <br />,. <br />~, <br />I <br />~ ' <br />, <br />~ <br />~_ <br />