My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL49221
DRMS
>
Back File Migration
>
General Documents
>
GENERAL49221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:27:44 PM
Creation date
11/23/2007 4:56:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
10/26/1990
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit C <br />!continued) <br />Permit Stipulations and Their Status <br />/ern <br />1632E <br />Nunber Stipulation Sta tus <br />13 A performance bond in the amount of Resolved, <br />$2,646,300.00 payable to the State of Colorado 10/3/85 <br />and the Office of Surface Mining, must be filed <br />with the Division within thirty (30) days of <br />issuance of the proposed decision. <br />Two additional permit stipulations were added to the permit as a <br />result of Minor Revision No. 8 and Technical Revisions 5 and 7. These <br />stipulations and their status are: <br />14 Peabody Coal Company will submit revised <br />maps and pages for MR-O8, realignment of <br />Haul Road A between stations 64+00 and 81+00, <br />by November 20, 1989. The new alignment will <br />shorten Haul Road A slightly, increase grade <br />from approximately 6% to 7%, and eliminate two <br />hairpin turns. Submittal should include <br />revised Table 12-4 (culvert sizing), revised <br />Exhibits 7-10, 12-1, 12-SA3, 12-8A4, and any <br />other pages or exhibits pertaining to this <br />stretch of Haul Road A. <br />15 Peabody Coal Company must submit bonding <br />information to cover costs of haul road <br />surface material removal, initial cast spoil <br />material replacement, and topsoil replacement <br />by December 22, 1989. This information must <br />cover, at a minimum, all specific tasks which <br />were addressed in TR 5, subsequent Division <br />adequacy review letters, and Peabody responses <br />to those letters. <br />Resolved, <br />12/14/89 <br />Resolved, <br />4/30/90 <br />(see TR 7) <br />- 59 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.