Laserfiche WebLink
~i <br />TABLE 1 <br />Evaporation Depletion Analysis <br />North River Pit <br />All-Rite Paving 8 Redi-Mix, Inc. <br />' Ground Elevation :4043 h <br />`I <br />Month Gross <br />Evap. Gross <br />Evap. <br />In. Gross <br />Evap. <br />tt Total <br />Preclp. <br />In. Ett. <br />Preclp. <br />n. Net <br />Evap. <br />In. Net <br />Evap. <br />ti <br />Column-> 1 2a 2b 3 4 Sa Sb <br />Nov. 4.00 1.80 0.15 0.60 0.42 1.38 0.12 <br />Dec. 3.00 1.35 0.11 0.35 0.24 1.11 0.09 <br />Jan. 3.00 1.35 0.11 0.44 0.31 1.04 0.09 <br />Feb. 3.50 1.58 0.73 0.32 0.22 1.36 0.11 <br />Mar. 5.50 2.48 0.21 0.90 0.63 1.85 0.15 <br />I. 9.00 4.05 0.34 1.21 0.85 3.20 0.27 <br />M 12.00 5.40 0.45 2.54 1.78 3.62 0.30 <br />Jun. 14.50 6.53 0.54 2.12 1.48 5.05 0.42 <br />Jul. 15.00 6.75 0.56 2.16 1.51 5.24 0.44 <br />Au 13.50 6.08 0.51 2.00 1.40 4.68 0.39 <br />Se 10.00 4.50 0.38 1.03 0.72 3.78 0.31 <br />Oct. 7.00 3.15 0.26 0.73 0.51 2.64 0.22 <br />Total 100.00 45.02 3.75 14.40 10.08 34.94 2.91 <br />Column 1 Evaporation distribution tram draft criteria dated Fetxvary, 1995. <br />2 Mean evaporation Irom NWS 33. <br />3 Mean monthly precipdatbn from Lamar station. <br />4 ER. precip. = 70°6 of Total precipitation (col. 3). <br />5 Net evap. =Gross evap. (col. 2a) - Eff. precip. (col. 4) <br />