Laserfiche WebLink
<br />Table 6 <br />Total Rep{acement <br />North River Pit <br />All-Rite Paving 8 Red+-MBt, Inc. <br />Month Actual <br />CU <br /> <br />ac'ft Recharge <br />(1800 ft) <br />14 shar. <br />ac'ft Mining <br />Depl. <br /> <br />ac'ft Lagged <br />Mining Depl. <br /> <br />ac' Net Recharge <br />Dep. /Surplus <br /> <br />ac'ft <br />Column -> 1 3 4 5 <br />Mar. 1.60 0.02 0.76 0.61 -0.59 <br />I. 13.40 0.26 1.34 1.16 -0.90 <br />Ma 20.70 0.80 1.47 1.34 -0.54 <br />Jun. 28.90 1.34 1.97 1.72 -0.38 <br />Jul. 27.70 1.84 2.06 1.91 -0.07 <br />Au 20.30 2.03 1.77 1.72 0.32 <br />Set 12.00 1.90 1.44 1.43 0.47 <br />Oct 11.00 1.67 1.02 1.07 0.61 <br />Nov. 0.00 1.42 0.57 0.66 0.76 <br />Dec. 0.00 1.04 0.45 0.51 0.53 <br />Jan. 0.00 O.B4 0.36 0.43 0.41 <br />Feb. 0.00 0.71 0.53 0.54 0.18 <br />Mar. 1.30 0.64 0.76 0.73 -0.09 <br />I. 13.40 0.81 1.34 1.23 -0.42 <br />M 20.70 1.29 1.47 1.39 -0.11 <br />Jun. 28.90 1.77 1.97 1.77 0.00 <br />Jul. 27.70 2.22 2.06 1.95 0.27 <br />Au 20.30 2.37 1.77 1.75 0.62 <br />Set 12.00 2.20 1.44 1.46 0.73 <br />Oct 11.00 1.94 1.02 1.09 0.84 <br />Nov. 0.00 1.66 0.57 0.68 0.97 <br />Dec. 0.00 1.24 0.45 0.53 0.71 <br />Jan. 0.00 1.02 0.38 0.45 0.57 <br />Feb. 0.00 0.87 0.53 0.55 0.32 <br />Total 270.90 31.91 27.52 26.68 .23 <br />Column 1 Actual CU =Actual CU (Table 5, Row 6) <br />Z Recharge = Calc. replacement from Gbver <br />3 Mining Depl. = NM Depl. (Tablet, Col. ~ <br />4 Lagged Mining Depl. = Cak. replacement from Gbver <br />5 Net Recharge (depl.laurplus) =Recharge (Cd. 2) -Lagged Mining Depl. (Col. d) <br />HATTON WATER CONSULTANTS-01/27/99- c:ljobslquattro4triverttables <br />