WEST PIT DIV REVISED FIELD DIRECTIVE
From
DMG
To
KESSLERS RECLAMATION
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rock filter blankets may be replaced with a fabric liner. Anon-woven <br />fabric or erosion control fabric liner with an EOS smaller than U.S. <br />Standard Sieve No 70 (0.21mm) with an open area not to exceed ten <br />percent (10$), and openings greater than U.S> Standard Sieve Size No. <br />100 .(0.149mm) with at least four percent (4$) open area. This shall <br />be installed according to manufacturer's specifications, and covered <br />by six inches (6") of clean sand or gravel from off site. Fabric <br />liner shall be placed longitudinally down the length of the channel. <br />Fabric shall be placed longitudinally up the sideslopes with a minimum <br />three inches (3") of overlap between strips, with 12"-18" long metal <br />anchors every square foot. New fabric lengths should be single- <br />overlapped with the up stream fabric above the downstream fabric. <br />Anchor trenches at the top and the bottom of the slope shall be six <br />inches (6") wide and twelve inches (12") deep and anchored on o:ne foot <br />(1') centers. <br />Total channel dimensions given above are those dimensions at tlae rock <br />surface. The rip-rap must be installed over the entire cross section. <br />All junctions must be properly keyed in place 3 feet deep, f'or a 5 <br />foot long key length. The lower rip-rap area consisting of )L75' of <br />rip-rap shall end at the edge of tha bottoa of Magpie Creek with the <br />key length mentioned above. From the key area, the rip-rap ditch <br />shall extend ten feet with grade no steeper than 2$. After 10 feet, <br />the grade of the rip-rap ditch shall resume and be no steeper lthan 8$ <br />(this grade shall be made as low as possible). This area shall be <br />marked by the PROJECT MANAGER. Side slopes through the embanlanent of <br />Magpie Creek Diversion shall be no steeper than 3:1. The diversion <br />shall enter Magpie Creek at an angle no greater than 45 degrees. This <br />area will be marked by the PROJECT MANAGER. All grades must be <br />inspected and approved by the PROJECT MANAGER prior to rip-rap <br />placement. <br />The channel between the upper and lower junction areas should! be 15 <br />feet wide, minimum sideslopes of 2H:1V with a channel gradient of <br />approximately 4$. Total depth of the diversion should be 2 feet. No <br />additional disturbance shall occur beyond the existing disturbance in <br />the natural drainage. The existing portion of the lower diverted <br />natural drainage shall be backfilled with the adjacent stockpiled <br />material and blend in with the existing topography. All regraded <br />slopes shall be revegetated in accordance with Task 7. <br />Access to the West Pit shall be on the West Pit access road. This <br />road serves as two functions; access to the West Pit and drainage <br />control on the recently reclaimed slope. Some minor work may be <br />required to access the West Pit by the CONTRACTOR. The drainage from <br />the access road shall tie in with the diversion ditch as directed by <br />the PROJECT MANAGER. The CONTRACTOR shall maintain the access road to <br />the West Pit to equal or better condition after the job is completed, <br />and assure that tha road functions as a drainage diversion. <br />9. Additional Rip-Rap Material if needed- Additional x•ip-rap <br />material will be utilized on the West Pit Diversion ditch at the <br />direction of the Project Manager. 75 cy of rip-rap @ $20.00/c:y. <br />c:\gec\fd2 <br />