Laserfiche WebLink
<br />INORGANIC DATA QII7ILITY ASSURANCE REVIEM <br />80LDIN6 TIMES <br />All CLP-SOW holding times were met. <br />Yee X No _ <br />All technical holding times were mat. <br />Yee ~C_ No <br />Comments: None <br />INSTRUMENT CALIBRATIONS STANDARDS AND BLAN[S <br />Initial instrument calibrations were performed according to contract <br />requirements. <br />Yee X No _ <br />Comments: None <br />The instruments were calibrated daily and each time an analysis run was <br />performed. <br />Yea X No _ <br />Commenter None <br />The instruments ware calibrated using one blank and the appropriate <br />number of standards. <br />Yea X No <br />Ca®ente: None <br />PORT( 1 - SAMPLE ANALYSIS RESULTS <br />Sample analyses were entered correctly on the Form I'e. <br />Yee No X <br />Comments: According to the raw data, two different ICPe were used for <br />sample analyses. The soil samples were analyzed on instrument TJA fl <br />and the water samples were analyzed on instrument TJA /2. According to <br />FORM 14, the Analytical Run Loge, only instrument TJA fl was used far <br />the analysis of both soils and waters. IDLe, IECe and Linear Ranges <br />were only provided for instrument TJA ~1. The results for, the water <br />eemplee were reported correctly on the FORM Se from TJA ~'2, however the <br />IDLe used to report the water samples could not be verifies. <br />4 <br />